Charlotte Builders & General Contractors
Handover-ready glass, on your CO date.
Warranty-safe post-construction window cleaning — stucco, paint, and labels gone, no scratches, on schedule.
Filmed-over glass turns a finished home into a callback.
Every other trade can be flawless, but dirty windows tell the buyer it was rushed — and bad scraping scratches glass you'll pay to replace.
Construction film won't wipe off
Stucco, paint, labels, and adhesive need proper removal.
Scratched glass = warranty claims
Untrained crews leave permanent damage you pay to replace.
The CO date doesn't move
It has to be perfect by the walkthrough, not after.
The final clean, done right and on time.
Rough and final cleans, safe scraping, locked to your build schedule — one less trade to chase.
- No-scratch technique on tempered & coated glass
- Full stucco, paint, label & adhesive removal
- Rough + final cleans phased to your build
- Locked to your CO / walkthrough date, COI on file
The one trade GCs don't chase.
date
safe
“Pressure washed all of the concrete and stone steps at our house. Before and after are amazing. Sorely needed, but wow! Did a great job. Definitely recommend.”
Built around your timeline.
Send the build + CO date
Address, scope, and your walkthrough deadline.
We phase the cleans
Rough and final, slotted cleanly between your trades.
Flawless for the walkthrough
No scratches, no warranty drama, on time.
One trade you'll never have to chase.
Send the build and your CO date — quote back within 24 hours.
7-Day Re-Clean Guarantee — not perfect? we come back free
Quick answers
Do you do post-construction window cleaning?
Yes. We specialize in the final clean — removing stucco splatter, paint overspray, labels, adhesive, and silicone from glass, frames, and tracks so the home is flawless for the walkthrough.
Will scraping scratch the glass?
No. We use trained razor technique with fresh blades and the right solution, following tempered and coated-glass guidelines, so debris comes off without scratching — protecting the glass warranty.
Can you hit our CO or buyer walkthrough date?
Yes. We schedule rough and final cleans to your construction timeline and lock the final clean to your certificate-of-occupancy or buyer walkthrough date.